WATCH THE WORKFLOW

Field Demonstration

See how TheStake establishes a square unit, records four exterior corner stakes, and documents each excavation level.

TheStake Field Workflow

A guided demonstration of setup, four-point grid establishment, 10 cm capture intervals, LiDAR scanning, and report export.

Request a Live Demo
01

Establish the origin

Set DTR at the north or GPS reference corner. The system records time, position, temperature, and available weather data.

02

Place four corner stakes

Three projected positions guide the remaining exterior stakes around the square excavation unit.

03

Capture every level

At each 10 cm level, collect imagery, LiDAR, notes, and optional scheduled captures.